Project: 440 MW gas turbine power plant
Location: Northern Europe
The 440 MW plant was commissioned in 2009-2010 and was in full operation until 2011-2012, then in stand-by mode and, if required, in winter, switched on for city heating. The last maintenance was in 2017, in 2018 the plant was completely shut down and currently maintained and kept at temperature.
Delivery time from now on
Price approx. 74.5 million Euro ex location